Unanswered [1] | Urgent [0]
  

Posts by laura2024abroad
Name: Laura Nguyen
Joined: Oct 22, 2023
Last Post: Oct 22, 2023
Threads: 1
Posts: -  
From: Vietnam
School: FTU

Displayed posts: 1
sort: Oldest first   Latest first  | 
laura2024abroad   
Oct 22, 2023
Writing Feedback / [WRITING TASK 1] The diagrams below show the site of a school in 2004 & the plan for changes in 2024 [2]

The diagrams below show the site of a school in 2004 and the plan for changes to the school site in 2024



The maps illustrate some changes to the site of a school over a period of 20 years (2004-2024)
Overall, the school site is expected to experience considerable changes during the period shown. The most noticeable differences between the two maps are the expansion of roads to car parks and the reduction of a sports field.

As can be seen from the maps, the school is likely to witness an increase in the total number of students from 600 students in 2004 to 1000 students in 2024. Therefore, the school site would need more school buildings to create enough rooms for every student. School building 1 will merge with school building 2 and a new school building will be built on the original site of a sports field.

Turning to other school facilities, we can see that a path from the entrance to the sports field will be narrowed by half and lead to school building 3 instead. A new road will be constructed in the middle of the school site and head to a new second car park in the northeastern school site. The sports field will be relocated to the west of the school site next to car park 2 and narrowed significantly.



  • 2004

  • 2024
Do You Need
Academic Writing
or Editing Help?
Need professional help with your assignments? Fill out one of these forms:

Graduate Writing / Editing:
GraduateWriter form ◳

Best Essay Service:
CustomPapers form ◳

Excellence in Editing:
Rose Editing ◳

AI-Paper Rewriting:
Robot Rewrite ◳