Unanswered [1] | Urgent [0]
  

Home / Writing Feedback   % width   Posts: 4


IELTS TASK 1 : Developing on Chorleywood Village



SHanafi 120 / 357  
Mar 18, 2014   #1
Hi, all. This is the third times I write in the same map, it does not matter for me to write same prompt repetitively, in order to increase my understanding.I am glad that all of you deign to compare my two previous.

======================================================

The given map reveals the information regarding the developing of Chorleywood village in 126 years started from 1868 to 1994.

Overall, while three transportation accesses were built between 1909 and 1970, the four areas in Chorleywood, shaped in the legend, also built consecutively.

Turning to the details, started from 1868 to 1883 a small area appeared nearly Chorleywood Park and Golf course while horizontally shaded area, built between 1883 and 1992, constructed around Chorleywood station. Next, by comparison with the two darkly shaded areas which were established in the west corner and south-east station, the newest area showed tremendous developed in almost center and east of village.

A more detail looked at the transportation accesses. By comparison with Railway and Motorway, number of main roads quantitatively showed in the north and west side of map. On the other hand, the length of railway connecting west-to-east side of village built in 1909 while the motorway connecting north-to-south appeared in 1970.

Interestingly, the centre of village showed the highest rate of development from 1868 to 1883 and from 1970 to 1994.


  • chorleywood.jpg


dumi 1 / 6793  
Mar 18, 2014   #2
The given map reveals the information regarding the developingdevelopment of Chorleywood village in 126 years started from 1868 to 1994.

Overall, while three transportation accesses were built between 1909 and 1970, the four areas in Chorleywood, shaped in the legend, also built consecutively

I see this is not the most obvious trend. (Overview should be something that you notice at a glance) This is what I suggest;
Overall, the least development of land had been taken place during the period of 1868 to 1883 while the period 1970 to 1994 recorded the highest level of development of Choreywood village.
eddies [Contributor] 25 / 1170  
Mar 18, 2014   #3
reveals

To describe a map, I think "depict" is the best word to replace 'reveal'.
Take a long hard look at where your tense is going for this;

the length of railway connecting west-to-east side of village built in 1909

I am not sure you have learned from the previous lesson. In that lesson (essayforum.com/writing-feedback-3/task-describing-map-chorleywood-area-55905/), I provided you a very clear explanation regarding the issues.

number of main roads quantitatively showed

the two main roads plainly showed...
OP SHanafi 120 / 357  
Mar 18, 2014   #4
hi, eddies

he length of railway connecting west-to-east side of village built in 1909

. Can I say that you mean tenses consistency usage (continuous and past simple). When I was wrote, in my head "connecting" as participle (the reform of "which is connect"). Then,the map gives past information so I used "built". Therefore, I was read your previous comment Main roads from the east to the northwest and the north to southwest of the map before I write. But I do think about making the length sentence shorter with hyphen. Overall, no excuse I am still bad in observing, analyzing, synthesizing, and also far from mature writing.


Home / Writing Feedback / IELTS TASK 1 : Developing on Chorleywood Village
Do You Need
Academic Writing
or Editing Help?
Fill out one of these forms:

Graduate Writing / Editing:
GraduateWriter form ◳

Best Essay Service:
CustomPapers form ◳

Excellence in Editing:
Rose Editing ◳

AI-Paper Rewriting:
Robot Rewrite ◳

Academic AI Writer:
Custom AI Writer ◳