The diagram illustrates various stages involved in making material called concrete canvas into a storage area.
The initial impression from the process is that it comprises 8 steps, beginning with concrete canvas being manufactured from raw material, followed by a number of processing stages and ending with the final product.
At the beginning of the process, the concrete canvas is composed of 3 distinct materials. The surface is made of fibrous components, the middle layer uses dry concrete while the bottom utilizes waterproof substance. After this, the concrete is delivered to a place prior to being unwrapped.
The process continues with the sheet of concrete canvas having corners anchored by pegs and being spreaded on the ground by a truck until its width extends 10 meters. Subsequently, an air pump is used to inflate that sheet in one side whereas a door is settled in the opposite direction. Once this newly formed storage reaches a height of 8 meters, it is prevented from cracks and permeation by watering on its surface. At the final stage of the process, the storage is settled for 20-24 hours before being put into use.
The initial impression from the process is that it comprises 8 steps, beginning with concrete canvas being manufactured from raw material, followed by a number of processing stages and ending with the final product.
At the beginning of the process, the concrete canvas is composed of 3 distinct materials. The surface is made of fibrous components, the middle layer uses dry concrete while the bottom utilizes waterproof substance. After this, the concrete is delivered to a place prior to being unwrapped.
The process continues with the sheet of concrete canvas having corners anchored by pegs and being spreaded on the ground by a truck until its width extends 10 meters. Subsequently, an air pump is used to inflate that sheet in one side whereas a door is settled in the opposite direction. Once this newly formed storage reaches a height of 8 meters, it is prevented from cracks and permeation by watering on its surface. At the final stage of the process, the storage is settled for 20-24 hours before being put into use.
Ielts writing task 1.