Road changes connected with an installation process
The picture illustrates the Foster Road's alterations on both SE 84 th and 85 th avenue as the result of instalation process. At the first glance, it is immediately apparent that Foster road became more convenient by means of trees and road-arrangement facilities' existances.
To begin with, Foster Road before the instalation consist of two main ways throughed by driver and separated into two path in opposite lane. Beside that, the road did not have any space for walkers to pass, so did the bicycle lanes. Furthermore, the road looks so warm because there is no plants neither on left nor right side of the way.
Interestingly, a significant improvement witnessed on the road after the instalations. It can be seen obviously that there a lot of trees grown throughout the Foster Road's, makes the road become so greeny. In addition, the other changes show by the existance of pedestrian patway on both sides of road, so did the bicycle lane. Likewise, the new crossing road build beside the traffic lights.
17800103_13444923022.jpg